LTA.PROMPT Submission: Complete Guide 2025/2026

Everything you need to know โ€” what LTA.PROMPT is, when it is required, documents needed and how to avoid delays.

What is LTA.PROMPT?

LTA.PROMPT is the Land Transport Authority's online permit portal for applications related to works on or near public roads, road reserves and pedestrian footways in Singapore. Any contractor or developer whose works affect a public street must submit a permit application through LTA.PROMPT before works commence.

Starting works without a valid LTA.PROMPT permit is an offence under the Road Traffic Act. Fines and stop-work orders can be issued by LTA for non-compliance.

When is LTA.PROMPT Required?

๐Ÿšง Lane Occupation

Occupying any part of a traffic lane or shoulder on a public road, even temporarily during construction operations.

๐Ÿšถ Footway Works

Works within a pedestrian footway โ€” hoarding, road opening or utility access points that affect pedestrian movement.

๐Ÿ—๏ธ Construction Access

Construction vehicles accessing a site via a public road in a way that affects normal traffic flow or requires road management.

๐Ÿ”ง Utility Diversion

Diverting or protecting services within road reserve โ€” water mains, telecommunications cables, power cables.

๐Ÿ“ Road Opening

Breaking open road carriageway or footway for utility works, drainage or structural foundations.

๐Ÿชง Temporary Signage

Erecting temporary directional or construction-related signs on or adjacent to public roads and road reserves.

Key Documents Required

See the full Submission Checklist โ†’

Common Reasons for LTA Technical Comments

Most LTA.PROMPT RFIs arise from: incomplete site plans  ยท  TMP not matching site conditions  ยท  road signage layout missing or not to LTA standard  ยท  method statement not addressing traffic impact  ยท  insurance coverage gap  ยท  approved supervisor details missing or incorrect.

How Long Does Approval Take?

Simple lane occupation: 5โ€“15 working days. Road diversions with traffic impact: 3โ€“6 weeks. Complex diversions near expressways: longer. These are indicative; complete, first-pass submissions process faster.